Ticket Office Information
Uploaded Ad
Uploaded Ad
Merch Madness

Embed Code

close

Photo Gallery: Bridgeforth Stadium Renovations - Phase 2 -- 5/6/11 (Interiors) 5/8/2011
backforward
Embed This
Previous Gallery: Bridgeforth Stadium Renovations - Phase 2 --... Next Gallery: JMU Lacrosse vs. Towson - CAA title game - May 7,...
  • 682 1024 A view of the Bridgeforth consturction from near ISAT across I-81 205650453 JMUSports.com
    682 1024 Work is being done on the structure for the new videoboard and sound system. 205650454 JMUSports.com
    682 1024 Excavation work is being done for the north end zone seating structure. 205650455 JMUSports.com
    682 1024 Work is done on grading some rock around the pilings for the north end zone stands. 205650456 JMUSports.com
    682 1024 A view of the APC from field level at the north end zone. 205650457 JMUSports.com
    682 1024 Chairback seats for the upper deck await installation. 205650459 JMUSports.com
    682 1024 A specific 205650460 JMUSports.com
    682 1024 Workers continue to put the support structures in for the new videoboard. LEDs are in the white cases below awaiting installation starting on May 9. 205650461 JMUSports.com
    682 1024 Ladders await installation up to the videoboard structure. 205650462 JMUSports.com
  • 682 1024 In the middle right is the structure for the play clock below the videoboard at Bridgeforth. 205650464 JMUSports.com
    682 1024 Purple risers are being installed in the lower level of seating at Bridgeforth. 205650463 JMUSports.com
    682 1024 A view underneath the 100 level stands at Bridgeforth. 205650465 JMUSports.com
    682 1024 Looking up at the scaffolding for work near the suite level at Bridgeforth. 205650466 JMUSports.com
    682 1024 Doors are in at the Club Level entrance off the Grand Staircase. 205650467 JMUSports.com
    682 1024 One side of maple paneling is installed in the entrance to the Club Level. 205650468 JMUSports.com
    682 1024 Workers put in maple paneling into the other side of the entrance to the Club Level. 205650469 JMUSports.com
    682 1024 Wood working is going in at the north bar and lights have been installed along with the drop ceiling framing. 205650470 JMUSports.com
    682 1024 The staircase going from the Club Level to the Suite Level is in place and being completed. 205650471 JMUSports.com
  • 682 1024 The entrance from the Parking Deck to the Club Level is installed and painted. 205650472 JMUSports.com
    682 1024 Elevator and maple paneling is installed next to the entrance to the Club Level. 205650473 JMUSports.com
    682 1024 Drop ceiling, including lights and sound system speakers are in the ceiling of the Club Level. 205650475 JMUSports.com
    682 1024 A view of the south bar in the Club Level. 205650476 JMUSports.com
    682 1024 The men's bathroom of the Club Level has been tiled and is receiving toilets. 205650477 JMUSports.com
    682 1024 A view of the women's bathroom awaiting installations. 205650478 JMUSports.com
    682 1024 The counter top of the women's bathroom covered for protection. 205650479 JMUSports.com
    682 1024 A view of the conference room in the Club Level. 205650480 JMUSports.com
    682 1024 A view down the back hall of the Club Level. 205650481 JMUSports.com
  • 682 1024 The food prep area on the Club Level nears completion. 205650482 JMUSports.com
    1024 682 A view from the Suite Level of the foundation work in the north end zone. 205650483 JMUSports.com
    682 1024 The dry wall being installed in one of the Bridgeforth Suites. 205650484 JMUSports.com
    1024 682 A view down the corridor of the Suite Level at Bridgeforth, showing the entry portal. 205650485 JMUSports.com
    682 1024 A view of the work in the President's Suite at Bridgeforth. 205650486 JMUSports.com
    682 1024 The main lobby of the Suite Level at Bridgeforth as rooms are being framed out. 205650487 JMUSports.com
    682 1024 Workers continue to put together the stairs leading from the Suites to the Club Level. 205650488 JMUSports.com
    682 1024 Dry wall is installed in the ceiling of one of the suites at Bridgeforth. 205650489 JMUSports.com
    682 1024 Construction workers start smoothing the dry wall seams in one of the suites. 205650490 JMUSports.com
  • 682 1024 A view of the Athletic Director's Suite at Bridgeforth. 205650491 JMUSports.com
    682 1024 Looking from one of the doors into the main area of the Athletic Director's Suite. 205650492 JMUSports.com
    682 1024 A view from the Athletic Director's Suite looking at the videoboard area. 205650493 JMUSports.com
    682 1024 Purple risers are getting installed in the 100 level. 205650494 JMUSports.com
    682 1024 A view back of the completed flood wall and work on the north end zone sub-structure. 205650495 JMUSports.com
    682 1024 Workers take a break for lunch from their work on the Suite Level. 205650496 JMUSports.com
    682 1024 Workers clean up brick work on the Upper Concourse. 205650497 JMUSports.com
    682 1024 A worker power washes some structure in the Upper Concourse. 205650498 JMUSports.com
    682 1024 Steps are installed into the Upper Seating with front purple panels awaiting trimmimg for final opening. 205650499 JMUSports.com
  • 682 1024 Concession stands are getting paint and some of the secondary structure. 205650500 JMUSports.com
    1024 682 The elevator area is getting work done on it with the outer parts of the main press level elevator. 205650501 JMUSports.com
    682 1024 A view of campus from the Upper Concourse. 205650502 JMUSports.com
    682 1024 Looking down the steps on the north end of the stadium leading down from the Upper Concourse. 205650503 JMUSports.com
    682 1024 Workers take a break from work on one of the Upper Concourse bathrooms. 205650504 JMUSports.com
    682 1024 A view of the lower concourse and the APC from the north corner of the Upper Seating walkway. 205650505 JMUSports.com
    682 1024 Looking back at the Upper Deck from the Upper walkway corner of the north end zone. 205650507 JMUSports.com
    682 1024 Stands near completion in the Upper Deck. 205650508 JMUSports.com
    1024 682 Looking down at the foundation work for the north end zone seating, looking down from the Upper Concourse. 205650509 JMUSports.com
  • 682 1024 A view of the written press area with the structure going in. 205650510 JMUSports.com
    682 1024 Windows are being installed in the written press area of the Press Box. 205650511 JMUSports.com
    682 1024 The workroom for videographers and photographers is gettigg dry wall installed. 205650512 JMUSports.com
    682 1024 A view down the main hall of the Press Box as it has been drywalled. 205650513 JMUSports.com
    682 1024 The video production room has dry wall in it as construction continues in the Press Box. 205650519 JMUSports.com
    682 1024 The PA/Production room is getting upper framework installed. 205650520 JMUSports.com
    682 1024 A view of the work being done in the visiting radio booth in the Press Box. 205650521 JMUSports.com
    682 1024 The ceiling in the center camera deck is starting installation. 205650514 JMUSports.com
    682 1024 Looking back in the scoreboard room from the scaffold outside the Press Box. 205650515 JMUSports.com
  • 682 1024 A view to campus from the scaffold outside the Press Box. 205650516 JMUSports.com
    682 1024 Looking in the south end camera deck from the scaffold outside the Press Box. 205650517 JMUSports.com
    682 1024 Lookiing into the south stands nearing completion from the Press Box. 205650518 JMUSports.com
    1024 682 Looking at the freight elevator that carries supplies and equipment to the Suite and Press Box Levels. 205650522 JMUSports.com
    682 1024 Looking back at the underside of the stadium as it nears the final concrete pour on the floor. 205650523 JMUSports.com
    682 1024 The steps are continuing to be worked on for the north end staircase. 205650524 JMUSports.com
    682 1024 One of the holes awaiting concrete for support for the north end zone seating. 205650526 JMUSports.com
    682 1024 The tunnel at the north end zone knuckle heading onto the field. 205650525 JMUSports.com
    682 1024 A view of the structure work being done in preparation for north end zone seating installation. 205650527 JMUSports.com
  • 682 1024 Pilings await more concrete and seating structure. 205650528 JMUSports.com
1/73