682
1024
A view of the Club Level with most dry wall complete and painting beginning.
205632742
JMUSports.com
682
1024
A view of the main entry into the Club Level from the garage and the elevator between the Club and Suite Levels.
205632744
JMUSports.com
682
1024
The drop-ceiling grid is in place in the Club Level, as well as some of the light fixtures.
205632748
JMUSports.com
682
1024
Some of the lighting in place along the wall of the Club Level.
205632762
JMUSports.com
682
1024
A view of the South bar in the Club Level.
205632768
JMUSports.com
682
1024
Looking down the hall towards the bathrooms on the Club Level.
205632782
JMUSports.com
682
1024
The interior of the men's bathroom on the Club Level getting tile and countertops installed along with flooring.
205632788
JMUSports.com
682
1024
The women's bathroom on the Club Level is getting tile installed on the lower walls.
205632798
JMUSports.com
682
1024
The conference room off the Club Level is nearing completion.
205632800
JMUSports.com
682
1024
The back service hall off the Club Level is painted and getting its permanent doors.
205632801
JMUSports.com
682
1024
One of the suites nears complete framing as shown here.
205632802
JMUSports.com
682
1024
Looking down from the Suite Level to the Flood Wall that is getting the final rebar pieces in preparation for completion.
205632803
JMUSports.com
682
1024
A Suite-Level view of the metal scructure to go in place on the videoboard structure.
205632805
JMUSports.com
682
1024
A worker installs dry wall in one of the suites at Bridgeforth.
205632807
JMUSports.com
682
1024
The Athletic Director's Suite at Bridgeforth has some of the dry wall in place.
205632809
JMUSports.com
682
1024
Workers continue to rough-in various areas in the Athletic Director's Suite at Bridgeforth.
205632812
JMUSports.com
1024
682
Looking down the hall at Bridgeforth Stadium's Suite Level
205632815
JMUSports.com
682
1024
Looking down the upper concourse.
205632818
JMUSports.com
682
1024
Workers complete the final section of the upper concourse walkway.
205632822
JMUSports.com
682
1024
Work going on the bathrooms in the Upper Concourse.
205632827
JMUSports.com
682
1024
Concessions stands in the Upper Concourse have been painted in preparation for equipment.
205632833
JMUSports.com
682
1024
Hardware hangs from the upper seating for the under covering for the Upper Concourse.
205632838
JMUSports.com
682
1024
The purple wall down the walkway of the Upper Concourse.
205632843
JMUSports.com
682
1024
Looking down the Upper Concourse at the steps and handrails in the upper deck.
205632846
JMUSports.com
682
1024
Grading occurring for the lower seating structure.
205632848
JMUSports.com
682
1024
The levels of the lower seating structure awaiting placement.
205632852
JMUSports.com
682
1024
The start of handrails for the steps into the Upper Deck Seating.
205632855
JMUSports.com
682
1024
The written press upper deck is in place with handrails and back wall supports in place.
205632858
JMUSports.com
682
1024
A view from the Press Level out to the videoboard.
205632861
JMUSports.com
682
1024
One of the workers installing the purple wall on the back of the press box looks in.
205632863
JMUSports.com
682
1024
Dry wall going up in the center camera deck in the press box.
205632867
JMUSports.com
682
1024
The riser deck in the coaches box.
205632870
JMUSports.com
682
1024
The video production room is framed out in the press box.
205632874
JMUSports.com
1024
682
A look down the hall in the press box at Bridgeforth.
205632876
JMUSports.com
682
1024
The north camera deck is framed out.
205632879
JMUSports.com
1024
682
Workers rough-in some of the plumbing in the press box.
205632882
JMUSports.com
682
1024
A look out into campus from the press box where supplies are coming up the lift.
205632885
JMUSports.com
682
1024
Looking down at the Upper Concourse at the two lifts working on the seating structure.
205632888
JMUSports.com
682
1024
Workers going over instructions for work on the north elevator structure.
205632892
JMUSports.com
682
1024
Lifts work on the North end staircase.
205632895
JMUSports.com
682
1024
A look down the ground floor passageway under the renovated area of Bridgeforth Stadium.
205632898
JMUSports.com
682
1024
Work being done on the footers for the north end zone seating.
205632902
JMUSports.com
682
1024
North end zone footers are nearing completion at Bridgeforth.
205632905
JMUSports.com
682
1024
The look down the tunnel in the knuckle along the flood wall.
205632907
JMUSports.com
682
1024
Workers continue to work on the footers for the north end zone seating.
205632910
JMUSports.com