Photo Gallery: Bridgeforth Stadium Renovations - Phase 2 (Interiors) -- 4/8/11 4/8/2011
backforward
Embed This
Previous Gallery: Bridgeforth Stadium Renovations - Phase 2 --... Next Gallery: University Park Construction -- 4/8/11
  • 682 1024 A view from the entry of the latest renovations of Bridgeforth. 205613668 JMUSports.com
    1024 682 A view from the lower concourse of the south elevator tower getting all the brick work completed. 205613600 JMUSports.com
    1024 682 The new videoboard structure is complete with all conduit and concrete work complete and awaiting installation of the videoboard. 205613601 JMUSports.com
    682 1024 A view from the entry into the Club Level, showing most of the dry wall work complete. 205613602 JMUSports.com
    682 1024 Looking from the south end of the Club Level at all the dry wall work that has been completed in the area. 205613604 JMUSports.com
    682 1024 Looking up through the steel at the area that will be the staircase leading from the Club Level up to the Suites. 205613606 JMUSports.com
    682 1024 The entrance to the Club Level from the Parking Garage has most of the dry wall complete. 205613607 JMUSports.com
    682 1024 A view of the North End bar in the Club Level 205613608 JMUSports.com
    682 1024 The men's bathroom has drywall complete as well as a coat of primer paint. 205613609 JMUSports.com
  • 682 1024 The drywall is complete and primer coat of pain is up in the women's bathroom on the Club Level. 205613610 JMUSports.com
    682 1024 The conference room just off the Club Level has been drywalled and is nearing completion. 205613611 JMUSports.com
    682 1024 Workers on the Suite Level pose for a picture during Friday's work. 205613612 JMUSports.com
    682 1024 Looking down the hall area of the Suite Level where the framing has been mostly completed and plumbing rough-ins are being finished. 205613613 JMUSports.com
    682 1024 205613615 JMUSports.com
    682 1024 A look at the work in the President's Suite at Bridgeforth Stadium. 205613616 JMUSports.com
    682 1024 A window on the Suite Level that will look back across to the mountains to the west. 205613618 JMUSports.com
    682 1024 Looking down from the Suites to the Club Level through the area that will be the new staircase adjoining the two areas. 205613620 JMUSports.com
    682 1024 Some of the high dry wall and insulation is going in on the Suites. 205613621 JMUSports.com
  • 682 1024 Stone work continues on the Grand Elevator as seen on the Suite Level. 205613622 JMUSports.com
    682 1024 The roof on the Grand Staircase nears completion. 205613623 JMUSports.com
    682 1024 The elevator is in on the main elevator off the Grand Entrance. 205613624 JMUSports.com
    682 1024 Another view of the work completed on the videoboard structure and new sidewalks outside the APC. 205613625 JMUSports.com
    682 1024 Workers continue to put together pieces of the purple backing to the upper level stands. 205613626 JMUSports.com
    682 1024 The Athletic Director's Suite being worked on in the renovations. 205613627 JMUSports.com
    682 1024 A view from outside the Suites looking up at the seating structure for the upper deck. 205613628 JMUSports.com
    682 1024 Pieces of the stadium seating backs awaiting placement in the stands. 205613629 JMUSports.com
    682 1024 The elevator shaft is in for the elevator from the Suites to the Club Level. 205613631 JMUSports.com
  • 682 1024 The men's and women's bathrooms have much of the plumbing conduit work in place 205613633 JMUSports.com
    682 1024 One of the upper concourse concession stands is being worked on with electrical rough-ins. 205613635 JMUSports.com
    682 1024 A view of the bottom stands pilings in place from the Upper Concourse. 205613636 JMUSports.com
    682 1024 Looking from the Upper Concourse walkway at the north end zone stands with some of the purple risers in place. 205613637 JMUSports.com
    1024 682 Looking from the upper concourse walkway to the scaffolding in place to put on the front of the press box. 205613638 JMUSports.com
    682 1024 Stone work continuing on the North end elevator/staircase area. 205613639 JMUSports.com
    682 1024 Framing is nearing completion on the press box level as seen from the north end entrance. 205613641 JMUSports.com
    682 1024 Looking in at one of the radio booths in the new press box. 205613642 JMUSports.com
    682 1024 The upper tier of the written press area in place and has been poured with concrete. 205613645 JMUSports.com
  • 682 1024 A view of the second tier of the written press area in the press box. 205613644 JMUSports.com
    682 1024 A view of the playing field from the second tier of the written press area in the press box. 205613643 JMUSports.com
    682 1024 The video/photo work area in the press box at Bridgeforth. 205613646 JMUSports.com
    682 1024 The second tier in the Home Coaches' Booth in the press box at Bridgeforth. 205613648 JMUSports.com
    682 1024 A view of the playing field from the center camera deck on the press level at Bridgeforth. 205613649 JMUSports.com
    682 1024 Looking across to campus from the center camera deck. 205613650 JMUSports.com
    682 1024 Another view of campus with trees in bloom from the center camera deck. 205613651 JMUSports.com
    682 1024 The second tiers are in place in the scoreboard room (near) and PA room (far) in the press box at Bridgeforth. 205613652 JMUSports.com
    682 1024 Looking from the north end of the video production room in the press box at Bridgeforth. 205613653 JMUSports.com
  • 682 1024 Looking back to the north end of the video production room at Bridgeforth. 205613656 JMUSports.com
    682 1024 Standing on the south camera deck and looking at the upper deck seating at Bridgeforth. 205613654 JMUSports.com
    682 1024 The back wall in the center camera deck has been drywalled with tech rough-ins going in. 205613658 JMUSports.com
    682 1024 A view of the north end seating structure from inside the press box. 205613659 JMUSports.com
    682 1024 A view of the lower part of the double elevator shaft in the north end of Bridgeforth. 205613660 JMUSports.com
    682 1024 The north end elevator shaft awaits a pair of elevators to be installed. 205613663 JMUSports.com
    682 1024 The pilings are in for the lower seating structure on the home sideline at Bridgeforth. 205613664 JMUSports.com
    682 1024 The pilings are in for the lower seating structure for the north end zone at Bridgeforth. 205613665 JMUSports.com