Photo Gallery: Bridgeforth Stadium Renovations - Phase 2 -- 3/25/11 3/26/2011
backforward
Embed This
Previous Gallery: Bridgeforth Stadium Club Level Photo Gallery Next Gallery: Bridgeforth Stadium Renovations-Phase 2-3/22/11
  • 682 1024 A view of the construction from Godwin Field 205590374 JMUSports.com
    682 1024 Looking at the construction from the Godwin Breezeway 205590376 JMUSports.com
    682 1024 A view of the construction fom the road near the bookstore. 205590378 JMUSports.com
    682 1024 Looking at the construction from the northeast corner of the stadium. 205590380 JMUSports.com
    682 1024 Looking at the construction with the glass being installed on the suites and framing going in on the press box. 205590382 JMUSports.com
    682 1024 Footers being dug for the north end zone stands in front of the flood wall. 205590385 JMUSports.com
    682 1024 A view of the entire work for the footers on the north end zone grandstand. 205590387 JMUSports.com
    682 1024 Workers welding the various joints of the new videoboard support structure. 205590390 JMUSports.com
    1024 682 A closer view of the work being done on the scoreboard structure. 205590392 JMUSports.com
  • 682 1024 Workers welding the various joints on the upper videoboard structure. 205590397 JMUSports.com
    682 1024 Framing is done for the next concrete pour for each of the support beams 205590399 JMUSports.com
    682 1024 A closeup view of the support bases for the videoboard, including the conduit for power and connections. 205590401 JMUSports.com
    682 1024 A shot of the videoboard supports framed out for concrete including conduit runs for power, video and audio connections. 205590404 JMUSports.com
    682 1024 More of the seating structure is lifted into the stands as workers await its lowering. 205590406 JMUSports.com
    1024 682 A piece of the back of the seating structure is lifted into the sky. 205590408 JMUSports.com
    682 1024 The seating structure back nears its location in the northwest corner of the end zone upper deck. 205590410 JMUSports.com
    682 1024 A view from the south end of the Club Level, where more dry wall and the ventilation system have been completed. 205590412 JMUSports.com
    682 1024 A view of the Club Level area where the elevator to the suites will be located. 205590414 JMUSports.com
  • 682 1024 Looking up at the sloped ceiling of the club room exit to the Club terrace at Bridgeforth. 205590419 JMUSports.com
    682 1024 Looking back at the south end bar area in the Club level. 205590417 JMUSports.com
    682 1024 Workers continue to put together the back side wall of the upper deck, adhering panels to the support beam. 205590422 JMUSports.com
    682 1024 A view of the work on the upper deck back wall from the Club terrace. 205590425 JMUSports.com
    682 1024 The back wall is put into place by workers on the back side of Bridgeforth's northwest corner. 205590428 JMUSports.com
    682 1024 Looking at the videoboard construction from the Club terrace. 205590430 JMUSports.com
    682 1024 Looking at the support bases for the videoboard being prepped for concrete as well as more seating structure to go up. 205590432 JMUSports.com
    1024 682 Workers connect conduit for the videoboard supports. 205590452 JMUSports.com
    682 1024 Looking from the Club terrace at the footers in the north end zone seating. 205590434 JMUSports.com
  • 682 1024 Work on dry wall on the conference room off the Club Level at Bridgeforth. 205590436 JMUSports.com
    682 1024 Looking down the row of suites with glass in a majority of the suite windows and temporary doors in place on several of them. 205590438 JMUSports.com
    1024 682 A view from the Suite level of the footers being prepped for concrete in the north end zone. 205590440 JMUSports.com
    682 1024 Looking inside the suites where almost all the suites and additional rooms have been framed out and are being set for electrical and plumbing rough-ins. 205590446 JMUSports.com
    682 1024 Another view of all the rooms being framed out, including the entrance to the President's Suite near the center of the frame. 205590449 JMUSports.com
    682 1024 A view near the south end of the suites with workers completing framing of an auxiliary area. 205590454 JMUSports.com
    682 1024 A view of the four suites awaiting window installation. 205590457 JMUSports.com
    682 1024 A concession stand is complete with concrete on the upper deck level. 205590459 JMUSports.com
    682 1024 A look over the back of the upper level to the sorority houses, dorms and surrounding neighborhoods. 205590461 JMUSports.com
  • 682 1024 A view through the stands of the workers working on installing the upper deck back wall 205590466 JMUSports.com
    682 1024 Looking at the stair structure supports in place as well as the skyline from the upper deck. 205590469 JMUSports.com
    682 1024 A view of the playing field from the upper level of Bridgeforth Stadium. 205590471 JMUSports.com
    682 1024 Looking to the north end of the stadium through an upper deck entry portal. 205590573 JMUSports.com
    682 1024 Looking to the south end of the stadium through an upper deck entry portal. 205590575 JMUSports.com
    682 1024 Looking across campus to URec and ISAT as well as the APC from the upper deck walkway. 205590577 JMUSports.com
    682 1024 A view of Newman Lake and the edge of the parking deck from the upper deck walkway. 205590581 JMUSports.com
    682 1024 A view looking south of the press box level under construction, with the center camera deck framed out. 205590583 JMUSports.com
    682 1024 Looking at the ceiling where drops are going in for ventilation and wiring work in the ceilings. 205590587 JMUSports.com
  • 682 1024 A closer view of the center camera platform framed out. 205590585 JMUSports.com
    682 1024 Looking down at the APC and videoboard from the press box. 205590590 JMUSports.com
    682 1024 Looking down at the upper deck seating structure from the press box at Bridgeforth Stadium. 205590592 JMUSports.com
    682 1024 A view near the center of the press box looking down at Zane Showker Field at Bridgeforth Stadium. 205590594 JMUSports.com
    682 1024 Workers construct one of the second tier areas, this one in the scoreboard operations room, in the press box. 205590598 JMUSports.com
    682 1024 A view from the end of the press box of the videoboard structure, Plecker Athletic Performance Center and Godwin Field. 205590600 JMUSports.com
    682 1024 A view from the press box across campus to URec, the east side of campus and the mountains in the distance. 205590602 JMUSports.com
    682 1024 Looking down at the various seating levels from the south end of the press box. 205590604 JMUSports.com
    682 1024 Looking at the west side of campus from the press box. 205590606 JMUSports.com
  • 682 1024 Looking down at Zane Showker Field from the south end of the press box. 205590613 JMUSports.com
    682 1024 Workers continue to construct the first upper tier in the new press box. 205590611 JMUSports.com
    682 1024 Looking across Godwin Hall from the press box to the mountains in the distance. 205590617 JMUSports.com
    682 1024 Looking across to the east campus from the press box level, with the mountains in the background 205590619 JMUSports.com
    682 1024 Looking at the main administration building from the south end of the press box. 205590633 JMUSports.com
    682 1024 Looking down at the various seating decks from the press box. 205590636 JMUSports.com
    682 1024 Looking from the press box level to the workers attaching the back of the stadium seating at the upper deck's northwest end. 205590641 JMUSports.com
    682 1024 Some of the kitchen equipment has already arrived at Bridgeforth. 205590642 JMUSports.com
    682 1024 One of the industrial strength popcorn poppers has been installed in the ground floor of Bridgeforth. 205590643 JMUSports.com
  • 682 1024 Several ovens and vats are in place in the ground floor commissary. 205590644 JMUSports.com
    682 1024 Two pizza ovens are already installed in the commissary. 205590645 JMUSports.com
    682 1024 Several fryers and other warmers are in place in the various rooms of the commissary. 205590648 JMUSports.com
    682 1024 Eletctrical outlets line the ceilings of the commissary to allow cooking and warming in numerous rooms. 205590649 JMUSports.com
    682 1024 The flood wall behind the stands at the northwest corner is complete. 205590650 JMUSports.com
    682 1024 The passthrough area of the flood wall is complete in the northwest corner of Bridgeforth Stadium. 205590651 JMUSports.com