Ticket Office Information
Uploaded Ad
Uploaded Ad
Merch Madness

Embed Code

close

Photo Gallery: Bridgeforth Stadium Renovations - Phase 2 -- 2/9/11 2/9/2011
backforward
Embed This
Previous Gallery: Bridgeforth Stadium Renovations - Phase 2 --... Next Gallery: Basketball Reunion
  • 682 1024 View of beginning construct of the student section during Brdigeforth Stadium construction 205518495 JMUSports.com
    682 1024 Seating risers waiting to be erected at Bridgeforth Stadium 205518497 JMUSports.com
    682 1024 View of upper level seats at Bridgeforth Stadium 205518500 JMUSports.com
    1024 682 View of ongoing construction of Bridgeforth Stadium 205518502 JMUSports.com
    682 1024 View of workers working on seat rasisers to be erected at Bridgeforth Stadium 205518505 JMUSports.com
    682 1024 View of club level seats and suites during construction at Bridgeforth Stadium 205518509 JMUSports.com
    682 1024 Close up view of the construction on the suites at Bridgeforth Stadium 205518512 JMUSports.com
    682 1024 View of the drill that will be putting in the holes for the score board supports in front of the Plecker Atheltic Performance Center 205518514 JMUSports.com
    1024 682 View of construction on the elevator shaft to the press box in Bridgeforth Stadium 205518515 JMUSports.com
  • 682 1024 View of the elevator and staircase lobby on the ground floor that leads to the press box 205518518 JMUSports.com
    682 1024 View of Aramark's walk-in refrigerator 205518521 JMUSports.com
    682 1024 View of a vent being placed in the cooking area in Bridgeforth Stadium 205518523 JMUSports.com
    682 1024 Wide view of the kitchen area in Bridgeforth Stadium 205518528 JMUSports.com
    682 1024 View of the kitchen area in Bridgeforth Stadium 205518530 JMUSports.com
    682 1024 View of the escaltor that leads to the club level seats in Bridgeforth Stadium 205518531 JMUSports.com
    682 1024 A second view of the drill being used to drill holes for the score board supports 205518535 JMUSports.com
    682 1024 A close-up view of the drill used to drill holes for the score board supports 205518537 JMUSports.com
    682 1024 View of the football equipment storage room 205518540 JMUSports.com
  • 682 1024 Construction of a scissor lift for truck deliveries underneath Bridgeforth Stadium 205518541 JMUSports.com
    682 1024 View from inside the club level at Bridgeforth Stadium 205518542 JMUSports.com
    682 1024 View inside of club level construction at Bridgeforth Stadium 205518545 JMUSports.com
    682 1024 View of doors to the parking garage from the club level at Bridgeforth Stadium 205518548 JMUSports.com
    682 1024 Another view of the club level from Bridgeforth Stadium 205518551 JMUSports.com
    682 1024 Another view of the club level at Bridgeforth Stadium 205518555 JMUSports.com
    682 1024 View of the back staircase going to the upper deck on the north end of Bridgeforth Stadium 205518557 JMUSports.com
    682 1024 View of the elevator shaft going up the north side of Bridgeforth Stadium 205518560 JMUSports.com
    682 1024 View of the start of construction of the President's Suite 205518566 JMUSports.com
  • 682 1024 View through the suite level of the south side staircase under construction 205518568 JMUSports.com
    682 1024 View of the stadium out from the suite level of Bridgeforth Stadium 205518571 JMUSports.com
    682 1024 View of the stadium from the suite level of Brdigeforth Stadium 205518575 JMUSports.com
    682 1024 View of drill working on the second hole for the score board supports. The covered hole to the right is the first of four holes to be completed. 205518578 JMUSports.com
    682 1024 Construction of the back wall of Bridgeforth Stadium. The background shows the top of the Champions Drive parking deck. 205518590 JMUSports.com
    682 1024 View of the suite level where you can see the construction of the upper deck seating 205518594 JMUSports.com
    682 1024 View of drill working on score board support holes. The pipe shown is used as part of the hole-drilling process. 205518587 JMUSports.com
    682 1024 View of construction on the upper level seats 205518603 JMUSports.com
    682 1024 View of the stadium from the suite level of Brdigeforth Stadium 205518608 JMUSports.com
  • 682 1024 View of the suite level with a view of the construction on the upper level seats at Bridgeforth Stadium 205518610 JMUSports.com
    682 1024 Construction of the flood wall underneath Bridgeforth Stadium 205518612 JMUSports.com
    682 1024 Outer view of the suite level from the lower deck of Bridgeforth Stadium 205518615 JMUSports.com
    682 1024 View of a future window in the staircase that overlooks the north side of campus 205518618 JMUSports.com
    682 1024 View from the stairwell of the fifth level of the Champions Drive parking deck 205518619 JMUSports.com
    682 1024 View of construction on the suites in Bridgeforth Stadium 205518622 JMUSports.com
    682 1024 View of Newman Lake from the upper concourse 205518623 JMUSports.com
    682 1024 View of sorority row from the upper concourse 205518625 JMUSports.com
    682 1024 View of the houses past sorority row from the upper concourse 205518627 JMUSports.com
  • 682 1024 View of the north side of campus from the upper concourse 205518630 JMUSports.com
    682 1024 View from the top of the north side staircase of Bridgeforth Stadium 205518633 JMUSports.com
    682 1024 View of campus from the top of Bridgeforth Stadium 205518634 JMUSports.com
    682 1024 More views of campus from the top of Bridgeforth Stadium 205518635 JMUSports.com
    682 1024 View of construction on the upper concourse 205518637 JMUSports.com
    1024 682 View of the elevator shaft at the back of stadium from the upper concourse. The top level of the elvator shaft reprsents the level the press box will be located on. 205518639 JMUSports.com
    682 1024 View from the uppoer concourse of Newman Lake and the Champions Drive parking deck 205518640 JMUSports.com
    682 1024 View from the walkway of the upper level seats in Bridgeforth Stadium 205518641 JMUSports.com
    682 1024 View looking up at the upper level seats from the walkway at Bridgeforth Stadium 205518642 JMUSports.com
  • 682 1024 View from the upper level walkway of the lower level seats at Bridgeforth Stadium 205518644 JMUSports.com
    682 1024 View of the upper and lower level seats from the upper level walkway at Bridgeforth Stadium 205518646 JMUSports.com
    1024 682 Another view of the upper and lower level seats from the upper level walkway in Bridgeforth Stadium 205518649 JMUSports.com
    682 1024 View of campus from the upper level walkway in Bridgeforth Stadium 205518653 JMUSports.com
    682 1024 View of the field from the upper level walkway of Bridgeforth Stadium 205518656 JMUSports.com
    682 1024 View of the field and the Plecker Athletic Performance Center from the upper level walkway at Bridgeforth Stadium 205518657 JMUSports.com
    682 1024 View of Newman Lake and Off-Campus Housing from the upper concourse of Bridgeforth Stadium 205518661 JMUSports.com
    682 1024 More views of Harrisonburg from the upper concourse of Bridgeforth Stadium 205518662 JMUSports.com
    682 1024 View of a future window in the north side staircase of Bridgeforth Stadium 205518664 JMUSports.com
  • 1024 682 View from the north end stairwell of the floor of the press box at Bridgeforth Stadium 205518666 JMUSports.com
    682 1024 Overall view of the ongoing construction of Phase 2 of Bridgeforth Stadium taken from in front of the old press box 205518667 JMUSports.com
1/65