Photo Gallery: Bridgeforth Stadium Renovations - Phase 2 -- 4/22/11 (Interiors) 4/22/2011
backforward
Embed This
Previous Gallery: 2011 JMU Football - Final Spring Practice Next Gallery: Bridgeforth Stadium Renovations - Phase 2 --...
  • 682 1024 A view of the stadium from just inside the construction site 205632722 JMUSports.com
    682 1024 The workers putting up the structure on the new videoboard, showing the width of the videoboard through the extentions. Remaining area on each end are for the sound system. 205632724 JMUSports.com
    1024 682 A side view of the substructure for the scoreboard. 205632726 JMUSports.com
    1024 682 A view from the Grand Entrance of the side of the videoboard structure. 205632730 JMUSports.com
    682 1024 Metal sections waiting to go up as part of the videoboard structure. 205632732 JMUSports.com
    682 1024 A view of the upper deck and press box from the Godwin breezeway. 205632734 JMUSports.com
    682 1024 Purple trimmed walls await lettering. 205632736 JMUSports.com
    682 1024 Entry doors are installed on the Club Level. 205632738 JMUSports.com
    682 1024 Painting is occurring in the Club Level, as shown by the wall behind the north bar. 205632740 JMUSports.com
  • 682 1024 A view of the Club Level with most dry wall complete and painting beginning. 205632742 JMUSports.com
    682 1024 A view of the main entry into the Club Level from the garage and the elevator between the Club and Suite Levels. 205632744 JMUSports.com
    682 1024 The drop-ceiling grid is in place in the Club Level, as well as some of the light fixtures. 205632748 JMUSports.com
    682 1024 Some of the lighting in place along the wall of the Club Level. 205632762 JMUSports.com
    682 1024 A view of the South bar in the Club Level. 205632768 JMUSports.com
    682 1024 Looking down the hall towards the bathrooms on the Club Level. 205632782 JMUSports.com
    682 1024 The interior of the men's bathroom on the Club Level getting tile and countertops installed along with flooring. 205632788 JMUSports.com
    682 1024 The women's bathroom on the Club Level is getting tile installed on the lower walls. 205632798 JMUSports.com
    682 1024 The conference room off the Club Level is nearing completion. 205632800 JMUSports.com
  • 682 1024 The back service hall off the Club Level is painted and getting its permanent doors. 205632801 JMUSports.com
    682 1024 One of the suites nears complete framing as shown here. 205632802 JMUSports.com
    682 1024 Looking down from the Suite Level to the Flood Wall that is getting the final rebar pieces in preparation for completion. 205632803 JMUSports.com
    682 1024 A Suite-Level view of the metal scructure to go in place on the videoboard structure. 205632805 JMUSports.com
    682 1024 A worker installs dry wall in one of the suites at Bridgeforth. 205632807 JMUSports.com
    682 1024 The Athletic Director's Suite at Bridgeforth has some of the dry wall in place. 205632809 JMUSports.com
    682 1024 Workers continue to rough-in various areas in the Athletic Director's Suite at Bridgeforth. 205632812 JMUSports.com
    1024 682 Looking down the hall at Bridgeforth Stadium's Suite Level 205632815 JMUSports.com
    682 1024 Looking down the upper concourse. 205632818 JMUSports.com
  • 682 1024 Workers complete the final section of the upper concourse walkway. 205632822 JMUSports.com
    682 1024 Work going on the bathrooms in the Upper Concourse. 205632827 JMUSports.com
    682 1024 Concessions stands in the Upper Concourse have been painted in preparation for equipment. 205632833 JMUSports.com
    682 1024 Hardware hangs from the upper seating for the under covering for the Upper Concourse. 205632838 JMUSports.com
    682 1024 The purple wall down the walkway of the Upper Concourse. 205632843 JMUSports.com
    682 1024 Looking down the Upper Concourse at the steps and handrails in the upper deck. 205632846 JMUSports.com
    682 1024 Grading occurring for the lower seating structure. 205632848 JMUSports.com
    682 1024 The levels of the lower seating structure awaiting placement. 205632852 JMUSports.com
    682 1024 The start of handrails for the steps into the Upper Deck Seating. 205632855 JMUSports.com
  • 682 1024 The written press upper deck is in place with handrails and back wall supports in place. 205632858 JMUSports.com
    682 1024 A view from the Press Level out to the videoboard. 205632861 JMUSports.com
    682 1024 One of the workers installing the purple wall on the back of the press box looks in. 205632863 JMUSports.com
    682 1024 Dry wall going up in the center camera deck in the press box. 205632867 JMUSports.com
    682 1024 The riser deck in the coaches box. 205632870 JMUSports.com
    682 1024 The video production room is framed out in the press box. 205632874 JMUSports.com
    1024 682 A look down the hall in the press box at Bridgeforth. 205632876 JMUSports.com
    682 1024 The north camera deck is framed out. 205632879 JMUSports.com
    1024 682 Workers rough-in some of the plumbing in the press box. 205632882 JMUSports.com
  • 682 1024 A look out into campus from the press box where supplies are coming up the lift. 205632885 JMUSports.com
    682 1024 Looking down at the Upper Concourse at the two lifts working on the seating structure. 205632888 JMUSports.com
    682 1024 Workers going over instructions for work on the north elevator structure. 205632892 JMUSports.com
    682 1024 Lifts work on the North end staircase. 205632895 JMUSports.com
    682 1024 A look down the ground floor passageway under the renovated area of Bridgeforth Stadium. 205632898 JMUSports.com
    682 1024 Work being done on the footers for the north end zone seating. 205632902 JMUSports.com
    682 1024 North end zone footers are nearing completion at Bridgeforth. 205632905 JMUSports.com
    682 1024 The look down the tunnel in the knuckle along the flood wall. 205632907 JMUSports.com
    682 1024 Workers continue to work on the footers for the north end zone seating. 205632910 JMUSports.com