The drywall is complete and primer coat of pain is up in the women's bathroom on the Club Level.
205613610
JMUSports.com
682
1024
The conference room just off the Club Level has been drywalled and is nearing completion.
205613611
JMUSports.com
682
1024
Workers on the Suite Level pose for a picture during Friday's work.
205613612
JMUSports.com
682
1024
Looking down the hall area of the Suite Level where the framing has been mostly completed and plumbing rough-ins are being finished.
205613613
JMUSports.com
682
1024
205613615
JMUSports.com
682
1024
A look at the work in the President's Suite at Bridgeforth Stadium.
205613616
JMUSports.com
682
1024
A window on the Suite Level that will look back across to the mountains to the west.
205613618
JMUSports.com
682
1024
Looking down from the Suites to the Club Level through the area that will be the new staircase adjoining the two areas.
205613620
JMUSports.com
682
1024
Some of the high dry wall and insulation is going in on the Suites.
205613621
JMUSports.com
682
1024
Stone work continues on the Grand Elevator as seen on the Suite Level.
205613622
JMUSports.com
682
1024
The roof on the Grand Staircase nears completion.
205613623
JMUSports.com
682
1024
The elevator is in on the main elevator off the Grand Entrance.
205613624
JMUSports.com
682
1024
Another view of the work completed on the videoboard structure and new sidewalks outside the APC.
205613625
JMUSports.com
682
1024
Workers continue to put together pieces of the purple backing to the upper level stands.
205613626
JMUSports.com
682
1024
The Athletic Director's Suite being worked on in the renovations.
205613627
JMUSports.com
682
1024
A view from outside the Suites looking up at the seating structure for the upper deck.
205613628
JMUSports.com
682
1024
Pieces of the stadium seating backs awaiting placement in the stands.
205613629
JMUSports.com
682
1024
The elevator shaft is in for the elevator from the Suites to the Club Level.
205613631
JMUSports.com
682
1024
The men's and women's bathrooms have much of the plumbing conduit work in place
205613633
JMUSports.com
682
1024
One of the upper concourse concession stands is being worked on with electrical rough-ins.
205613635
JMUSports.com
682
1024
A view of the bottom stands pilings in place from the Upper Concourse.
205613636
JMUSports.com
682
1024
Looking from the Upper Concourse walkway at the north end zone stands with some of the purple risers in place.
205613637
JMUSports.com
1024
682
Looking from the upper concourse walkway to the scaffolding in place to put on the front of the press box.
205613638
JMUSports.com
682
1024
Stone work continuing on the North end elevator/staircase area.
205613639
JMUSports.com
682
1024
Framing is nearing completion on the press box level as seen from the north end entrance.
205613641
JMUSports.com
682
1024
Looking in at one of the radio booths in the new press box.
205613642
JMUSports.com
682
1024
The upper tier of the written press area in place and has been poured with concrete.
205613645
JMUSports.com
682
1024
A view of the second tier of the written press area in the press box.
205613644
JMUSports.com
682
1024
A view of the playing field from the second tier of the written press area in the press box.
205613643
JMUSports.com
682
1024
The video/photo work area in the press box at Bridgeforth.
205613646
JMUSports.com
682
1024
The second tier in the Home Coaches' Booth in the press box at Bridgeforth.
205613648
JMUSports.com
682
1024
A view of the playing field from the center camera deck on the press level at Bridgeforth.
205613649
JMUSports.com
682
1024
Looking across to campus from the center camera deck.
205613650
JMUSports.com
682
1024
Another view of campus with trees in bloom from the center camera deck.
205613651
JMUSports.com
682
1024
The second tiers are in place in the scoreboard room (near) and PA room (far) in the press box at Bridgeforth.
205613652
JMUSports.com
682
1024
Looking from the north end of the video production room in the press box at Bridgeforth.
205613653
JMUSports.com
682
1024
Looking back to the north end of the video production room at Bridgeforth.
205613656
JMUSports.com
682
1024
Standing on the south camera deck and looking at the upper deck seating at Bridgeforth.
205613654
JMUSports.com
682
1024
The back wall in the center camera deck has been drywalled with tech rough-ins going in.
205613658
JMUSports.com
682
1024
A view of the north end seating structure from inside the press box.
205613659
JMUSports.com
682
1024
A view of the lower part of the double elevator shaft in the north end of Bridgeforth.
205613660
JMUSports.com
682
1024
The north end elevator shaft awaits a pair of elevators to be installed.
205613663
JMUSports.com
682
1024
The pilings are in for the lower seating structure on the home sideline at Bridgeforth.
205613664
JMUSports.com
682
1024
The pilings are in for the lower seating structure for the north end zone at Bridgeforth.
205613665
JMUSports.com