Embed Code



Previous Gallery: Bridgeforth Stadium Renovations - Phase 2 --...
Next Gallery: Bridgeforth Stadium Renovations-Phase 2-3/22/11
682
1024
Workers welding the various joints on the upper videoboard structure.
205590397
JMUSports.com
682
1024
Framing is done for the next concrete pour for each of the support beams
205590399
JMUSports.com
682
1024
A closeup view of the support bases for the videoboard, including the conduit for power and connections.
205590401
JMUSports.com
682
1024
A shot of the videoboard supports framed out for concrete including conduit runs for power, video and audio connections.
205590404
JMUSports.com
682
1024
More of the seating structure is lifted into the stands as workers await its lowering.
205590406
JMUSports.com
1024
682
A piece of the back of the seating structure is lifted into the sky.
205590408
JMUSports.com
682
1024
The seating structure back nears its location in the northwest corner of the end zone upper deck.
205590410
JMUSports.com
682
1024
A view from the south end of the Club Level, where more dry wall and the ventilation system have been completed.
205590412
JMUSports.com
682
1024
A view of the Club Level area where the elevator to the suites will be located.
205590414
JMUSports.com
682
1024
Looking up at the sloped ceiling of the club room exit to the Club terrace at Bridgeforth.
205590419
JMUSports.com
682
1024
Looking back at the south end bar area in the Club level.
205590417
JMUSports.com
682
1024
Workers continue to put together the back side wall of the upper deck, adhering panels to the support beam.
205590422
JMUSports.com
682
1024
A view of the work on the upper deck back wall from the Club terrace.
205590425
JMUSports.com
682
1024
The back wall is put into place by workers on the back side of Bridgeforth's northwest corner.
205590428
JMUSports.com
682
1024
Looking at the videoboard construction from the Club terrace.
205590430
JMUSports.com
682
1024
Looking at the support bases for the videoboard being prepped for concrete as well as more seating structure to go up.
205590432
JMUSports.com
1024
682
Workers connect conduit for the videoboard supports.
205590452
JMUSports.com
682
1024
Looking from the Club terrace at the footers in the north end zone seating.
205590434
JMUSports.com
682
1024
Work on dry wall on the conference room off the Club Level at Bridgeforth.
205590436
JMUSports.com
682
1024
Looking down the row of suites with glass in a majority of the suite windows and temporary doors in place on several of them.
205590438
JMUSports.com
1024
682
A view from the Suite level of the footers being prepped for concrete in the north end zone.
205590440
JMUSports.com
682
1024
Looking inside the suites where almost all the suites and additional rooms have been framed out and are being set for electrical and plumbing rough-ins.
205590446
JMUSports.com
682
1024
Another view of all the rooms being framed out, including the entrance to the President's Suite near the center of the frame.
205590449
JMUSports.com
682
1024
A view near the south end of the suites with workers completing framing of an auxiliary area.
205590454
JMUSports.com
682
1024
A view of the four suites awaiting window installation.
205590457
JMUSports.com
682
1024
A concession stand is complete with concrete on the upper deck level.
205590459
JMUSports.com
682
1024
A look over the back of the upper level to the sorority houses, dorms and surrounding neighborhoods.
205590461
JMUSports.com
682
1024
A view through the stands of the workers working on installing the upper deck back wall
205590466
JMUSports.com
682
1024
Looking at the stair structure supports in place as well as the skyline from the upper deck.
205590469
JMUSports.com
682
1024
A view of the playing field from the upper level of Bridgeforth Stadium.
205590471
JMUSports.com
682
1024
Looking to the north end of the stadium through an upper deck entry portal.
205590573
JMUSports.com
682
1024
Looking to the south end of the stadium through an upper deck entry portal.
205590575
JMUSports.com
682
1024
Looking across campus to URec and ISAT as well as the APC from the upper deck walkway.
205590577
JMUSports.com
682
1024
A view of Newman Lake and the edge of the parking deck from the upper deck walkway.
205590581
JMUSports.com
682
1024
A view looking south of the press box level under construction, with the center camera deck framed out.
205590583
JMUSports.com
682
1024
Looking at the ceiling where drops are going in for ventilation and wiring work in the ceilings.
205590587
JMUSports.com
682
1024
A closer view of the center camera platform framed out.
205590585
JMUSports.com
682
1024
Looking down at the APC and videoboard from the press box.
205590590
JMUSports.com
682
1024
Looking down at the upper deck seating structure from the press box at Bridgeforth Stadium.
205590592
JMUSports.com
682
1024
A view near the center of the press box looking down at Zane Showker Field at Bridgeforth Stadium.
205590594
JMUSports.com
682
1024
Workers construct one of the second tier areas, this one in the scoreboard operations room, in the press box.
205590598
JMUSports.com
682
1024
A view from the end of the press box of the videoboard structure, Plecker Athletic Performance Center and Godwin Field.
205590600
JMUSports.com
682
1024
A view from the press box across campus to URec, the east side of campus and the mountains in the distance.
205590602
JMUSports.com
682
1024
Looking down at the various seating levels from the south end of the press box.
205590604
JMUSports.com
682
1024
Looking at the west side of campus from the press box.
205590606
JMUSports.com
682
1024
Looking down at Zane Showker Field from the south end of the press box.
205590613
JMUSports.com
682
1024
Workers continue to construct the first upper tier in the new press box.
205590611
JMUSports.com
682
1024
Looking across Godwin Hall from the press box to the mountains in the distance.
205590617
JMUSports.com
682
1024
Looking across to the east campus from the press box level, with the mountains in the background
205590619
JMUSports.com
682
1024
Looking at the main administration building from the south end of the press box.
205590633
JMUSports.com
682
1024
Looking down at the various seating decks from the press box.
205590636
JMUSports.com
682
1024
Looking from the press box level to the workers attaching the back of the stadium seating at the upper deck's northwest end.
205590641
JMUSports.com
682
1024
Some of the kitchen equipment has already arrived at Bridgeforth.
205590642
JMUSports.com
682
1024
One of the industrial strength popcorn poppers has been installed in the ground floor of Bridgeforth.
205590643
JMUSports.com
682
1024
Several ovens and vats are in place in the ground floor commissary.
205590644
JMUSports.com
682
1024
Two pizza ovens are already installed in the commissary.
205590645
JMUSports.com
682
1024
Several fryers and other warmers are in place in the various rooms of the commissary.
205590648
JMUSports.com
682
1024
Eletctrical outlets line the ceilings of the commissary to allow cooking and warming in numerous rooms.
205590649
JMUSports.com
682
1024
The flood wall behind the stands at the northwest corner is complete.
205590650
JMUSports.com
682
1024
The passthrough area of the flood wall is complete in the northwest corner of Bridgeforth Stadium.
205590651
JMUSports.com