Photo Gallery: Bridgeforth Stadium Renovations - Phase 2 -- 3/21/11 3/21/2011
backforward
Embed This
Previous Gallery: Bridgeforth Stadium Renovations-Phase 2-3/22/11 Next Gallery: Bridgeforth Stadium Renovations - Phase 2 --...
  • 669 1024 A view from the APC deck of the continued changes to Bridgeforth Stadium 205582715 Photography/JMU Athletics Comm
    658 1024 A view from Godwin Field of the Bridgeforth Stadium Construction. 205582760 Photography/JMU Athletics Comm
    1024 678 A lift sits in waiting for work along the front of the suites and upper level seating while a backhoe cleans up some of the construction area. 205582761 Photography/JMU Athletics Comm
    1024 679 The crane is in place to help with the offloading of the new videoboard's supports. 205582729 Photography/JMU Athletics Comm
    758 1024 Two of the videoboard supports sit on the ground awaiting their place in front of the APC. 205582716 Photography/JMU Athletics Comm
    677 1024 A view of the construction through one of the east side portals at Bridgeforth. 205582717 Photography/JMU Athletics Comm
    1024 675 Looking at the construction including more framing being done on the press level and continued improvement on the suites. 205582718 Photography/JMU Athletics Comm
    685 1024 A view from near the railroad tracks looking over the construction compound. 205582731 Photography/JMU Athletics Comm
    686 1024 The stadium constructino near the railroad tracks shows the progress on the upper deck seating, concrete structures under the stands and the press box framing. 205582730 Photography/JMU Athletics Comm
  • 737 1024 Workers prep the seating risers for decking to be put in place. 205582720 Photography/JMU Athletics Comm
    648 1024 Workers move down on the lower part of the upper deck, putting walking deck structure in place and adhering it to the supports. 205582721 Photography/JMU Athletics Comm
    727 1024 A backhoe clears out in front of the flood well in preparation for the north end seating supports to start going in. 205582722 Photography/JMU Athletics Comm
    735 1024 Workers up high on the seating structure in the north end zone. 205582725 Photography/JMU Athletics Comm
    674 1024 Wrkers continue to adhere the upper deck seating supports to the cross beams. 205582723 Photography/JMU Athletics Comm
    695 1024 Workers look down from the back of the upper deck as the railing continues to go in place and the concrete buildings underneath the seating near completion. Note the seating structure in place above them. 205582726 Photography/JMU Athletics Comm
    703 1024 A view from behind the new upper deck with several levels of the walking decks for seating already in place. 205582727 Photography/JMU Athletics Comm
    1024 680 Construction workers up high as they work on some of the seating structure. 205582728 Photography/JMU Athletics Comm
    671 1024 A view of the construction of the stadium from the main administration building. 205582732 Photography/JMU Athletics Comm
  • 673 1024 Workers pull various pieces of rebar together for use in the construction. 205582734 Photography/JMU Athletics Comm
    1024 683 The crane prepares for lifting support beams in place for the new videoboard. 205582736 Photography/JMU Athletics Comm
    681 1024 A view of the underside conduit for Bridgeforth Stadium. 205582737 Photography/JMU Athletics Comm
    690 1024 The scaffolding is in place for workers to put the backside facade on Bridgeforth Stadium. 205582738 Photography/JMU Athletics Comm
    1024 683 A view of the north staircase showing much of the railing on the upper deck in place. 205582739 Photography/JMU Athletics Comm
    680 1024 A view from near the parking deck of the large scaffolding to be used in putting on the backside of the stadium expansion. 205582747 Photography/JMU Athletics Comm
    742 1024 A worker up on the scaffolding assists with the framing of the back part of the press box of the Bridgeforth Stadium expansion. 205582753 Photography/JMU Athletics Comm