The surrounding structure at the parking deck entrance to the Club Level is in place
205550809
JMUSports.com
682
1024
Looking back at the north end of the Club Level from the center of the area
205550818
JMUSports.com
682
1024
A view of the glass windows at the Club Level at Bridgeforth
205550816
JMUSports.com
682
1024
Structure near the entrance at the Club Level that will display the Circle of Champions
205550820
JMUSports.com
682
1024
The south service area in the Club Level
205550868
JMUSports.com
682
1024
A view behind the service area at the Club Level.
205550871
JMUSports.com
682
1024
A view from the Club Level terrace looking back at the Club and the suite level
205550823
JMUSports.com
682
1024
Looking up from the Club Terrace at the Press Box construction
205550827
JMUSports.com
682
1024
The metal overhangs off the press box roof start the window framing for the press box rooms
205550849
JMUSports.com
682
1024
Construction workers wave from the field at Bridgeforth
205550839
JMUSports.com
682
1024
The last remaining seating supports await their place on Bridgeforth Stadium
205550843
JMUSports.com
682
1024
A view from the Club Level of the north end flood wall
205550846
JMUSports.com
682
1024
Looking back at the Club Level entrance at the south
205550854
JMUSports.com
682
1024
The escalators are in place for patrons to reach the Club Level at Bridgeforth
205550856
JMUSports.com
682
1024
A closer view of the completed escalators
205550858
JMUSports.com
1024
682
A view from the bottom of the stairs and escalators to the Club Level
205550862
JMUSports.com
682
1024
A view of the Grand Staircase from the lower concourse
205550864
JMUSports.com
682
1024
Concessions equipment awaiting placement on the lower concourse
205550866
JMUSports.com
682
1024
Workers continue framing out the windows and fronts of the suites
205550975
JMUSports.com
682
1024
A view from the suite level, including one of the outdoor TV brackets in place
205550976
JMUSports.com
682
1024
Looking down the row of the suite level with facing starting to go in
205550978
JMUSports.com
682
1024
Workers frame out one of the suite fronts
205550979
JMUSports.com
682
1024
Looking down the length of the suites as most of the north end suites have framing on the interiors
205550984
JMUSports.com
682
1024
The back wall of the suite level - the window overlooks the parking garange and Newman Lake
205550985
JMUSports.com
682
1024
Standing in the Athletic Director's suite looking back to the north
205550988
JMUSports.com
682
1024
A view of the last two rises on the Grand Staircase from the suite level
205550990
JMUSports.com
682
1024
A view from the front of the President's Suite looking down on the field
205550986
JMUSports.com
682
1024
Workers excavate more dirt from around the scoreboard supports
205550829
JMUSports.com
682
1024
The backhoe digs out more dirt around the supports as the metal awaits placement prior to final concrete slab pouring for the support of the new videoboard
205550987
JMUSports.com
1024
682
Looking up at the Grand Staircase as more seating structure is lowered into place
205550993
JMUSports.com
682
1024
A view from the APC deck of the construction at Bridgeforth
205550998