Ticket Office Information
Uploaded Ad
Uploaded Ad
Merch Madness

Embed Code

close

Photo Gallery: Bridgeforth Stadium Renovations - Phase 2 -- 3/2/11 3/3/2011
backforward
Embed This
Previous Gallery: JMU MBB vs. William and Mary - CAA First Round -... Next Gallery: JMU Softball vs. Georgetown
  • 682 1024 A view of the construction of Bridgeforth 205550774 JMUSports.com
    1024 682 The roof over the Grand Staircase at Bridgeforth Stadium 205550777 JMUSports.com
    682 1024 Crew removes the concrete bases of the old scoreboard at Bridgeforth 205550779 JMUSports.com
    682 1024 Workers continue to put the flood wall in place at the north end zone at Bridgeforth 205550787 JMUSports.com
    1024 682 Work being done on the wiring conduits at Bridgeforth 205550789 JMUSports.com
    682 1024 Dry wall going up on a conference room on the Club Level 205550792 JMUSports.com
    682 1024 Bathrooms getting drywalled on the Club Level 205550795 JMUSports.com
    682 1024 A view of the north end of the club level at Bridgeforth 205550802 JMUSports.com
    682 1024 Looking at the south end of the Club Level at Bridgeforth 205550806 JMUSports.com
  • 682 1024 The surrounding structure at the parking deck entrance to the Club Level is in place 205550809 JMUSports.com
    682 1024 Looking back at the north end of the Club Level from the center of the area 205550818 JMUSports.com
    682 1024 A view of the glass windows at the Club Level at Bridgeforth 205550816 JMUSports.com
    682 1024 Structure near the entrance at the Club Level that will display the Circle of Champions 205550820 JMUSports.com
    682 1024 The south service area in the Club Level 205550868 JMUSports.com
    682 1024 A view behind the service area at the Club Level. 205550871 JMUSports.com
    682 1024 A view from the Club Level terrace looking back at the Club and the suite level 205550823 JMUSports.com
    682 1024 Looking up from the Club Terrace at the Press Box construction 205550827 JMUSports.com
    682 1024 The metal overhangs off the press box roof start the window framing for the press box rooms 205550849 JMUSports.com
  • 682 1024 Construction workers wave from the field at Bridgeforth 205550839 JMUSports.com
    682 1024 The last remaining seating supports await their place on Bridgeforth Stadium 205550843 JMUSports.com
    682 1024 A view from the Club Level of the north end flood wall 205550846 JMUSports.com
    682 1024 Looking back at the Club Level entrance at the south 205550854 JMUSports.com
    682 1024 The escalators are in place for patrons to reach the Club Level at Bridgeforth 205550856 JMUSports.com
    682 1024 A closer view of the completed escalators 205550858 JMUSports.com
    1024 682 A view from the bottom of the stairs and escalators to the Club Level 205550862 JMUSports.com
    682 1024 A view of the Grand Staircase from the lower concourse 205550864 JMUSports.com
    682 1024 Concessions equipment awaiting placement on the lower concourse 205550866 JMUSports.com
  • 682 1024 Workers continue framing out the windows and fronts of the suites 205550975 JMUSports.com
    682 1024 A view from the suite level, including one of the outdoor TV brackets in place 205550976 JMUSports.com
    682 1024 Looking down the row of the suite level with facing starting to go in 205550978 JMUSports.com
    682 1024 Workers frame out one of the suite fronts 205550979 JMUSports.com
    682 1024 Looking down the length of the suites as most of the north end suites have framing on the interiors 205550984 JMUSports.com
    682 1024 The back wall of the suite level - the window overlooks the parking garange and Newman Lake 205550985 JMUSports.com
    682 1024 Standing in the Athletic Director's suite looking back to the north 205550988 JMUSports.com
    682 1024 A view of the last two rises on the Grand Staircase from the suite level 205550990 JMUSports.com
    682 1024 A view from the front of the President's Suite looking down on the field 205550986 JMUSports.com
  • 682 1024 Workers excavate more dirt from around the scoreboard supports 205550829 JMUSports.com
    682 1024 The backhoe digs out more dirt around the supports as the metal awaits placement prior to final concrete slab pouring for the support of the new videoboard 205550987 JMUSports.com
    1024 682 Looking up at the Grand Staircase as more seating structure is lowered into place 205550993 JMUSports.com
    682 1024 A view from the APC deck of the construction at Bridgeforth 205550998 JMUSports.com
1/40