Ticket Office Information
Uploaded Ad
Uploaded Ad
Merch Madness

Embed Code

close

Photo Gallery: Bridgeforth Stadium Renovations - Phase 2 -- 1/17/11 1/17/2011
backforward
Embed This
Previous Gallery: Bridgeforth Stadium Renovations - Phase 2 --... Next Gallery: JMU Men's Basketball vs. UNC Wilmington - Jan. 15,...
  • 682 1024 View from Godwin Field of the Construction 205491410 JMUSports.com Buy Photo
    682 1024 A closer view from Godwin Field of the second phase construction 205491419 JMUSports.com Buy Photo
    682 1024 Work being done on the scoreboard area. 205491420 JMUSports.com Buy Photo
    682 1024 A view through the fense of the construction. 205491421 JMUSports.com Buy Photo
    682 1024 A closer view of the construction showing the north corner of the press box 205491422 JMUSports.com Buy Photo
    682 1024 A worker sits on the supports waiting for another support beam to be lowered 205491423 JMUSports.com Buy Photo
    682 1024 A view from in the APC of the construction. 205491424 JMUSports.com Buy Photo
    682 1024 A view from the north end near the bus stop at Godwin Hall of the construction, with the crane lifting steel. 205491426 JMUSports.com Buy Photo
    682 1024 A view from the A Lot near Varner Hall of the construction. 205491411 JMUSports.com Buy Photo
  • 682 1024 The north end zone staircase with all the metal work for the stairs themselves in place. 205491414 JMUSports.com Buy Photo
    1024 682 A view of the north end zone elevator shaft and start of the new press box. 205491417 JMUSports.com Buy Photo
    682 1024 Looking at the upper deck from the back side 205491418 JMUSports.com Buy Photo
1/12